
Wren Kitchens TMS Implementation: Cost Savings and Route Optimization Results
Case study showing how Wren Kitchens replaced manual planning with Aptean TMS to cut miles 15%, improve delivery lead time 60%, and reduce emissions.
Wren Kitchens, a kitchen retailer operating over 250 trucks and delivering 3,000 kitchens weekly, replaced spreadsheets and Google Maps with Aptean Routing & Scheduling Paragon Edition. The TMS enabled dynamic planning, order pinning, capacity management, and real-time visibility. Results included up to 15% fewer miles, 60% faster delivery lead times, vehicle fill rising from 92% to 94%, and 360,000 kg CO2 saved in the first year after implementation.
Replaced manual routing with TMS algorithms to reduce miles traveled by up to 15%
Improved customer delivery lead time by 60% through dynamic planning and order pinning
Increased vehicle fill from 92% to 94% and saved 360,000 kg CO2 in first year
Enabled capacity management across 250 trucks and 800 transport staff at eight sites
Provided real-time visibility and proof of delivery without manual paperwork