Case studies
WMS

Wilhelm Brandenburg WMS Retrofit Case Study: Cold Storage Modernization

Case study of Körber's multi-stage WMS and conveyor retrofit in a German meat processor's temperature-controlled warehouse under hygiene and production constraints.

Published
June 4, 2026
Read time
3 min read
Source

Details a one-year retrofit of Wilhelm Brandenburg's Frankfurt facility that integrated a 7,500-position tote buffer, automated incoming goods with robot depalletizing, added a stainless-steel SRM for 1,400 flow-rack positions, and upgraded controls on 23 existing SRMs and two kilometers of conveyor. All work occurred in +2°C cold storage while maintaining food-safety compliance and ongoing operations.

Key takeaways

Modern S7 PLC controls replaced legacy systems across 23 SRMs and four roll-container loaders, raising long-term equipment availability.

Robot layer depalletizer at incoming goods increased throughput to 1,000 containers per hour.

Stainless-steel SRM with plastic-chain load handling achieved 380 cycles per hour in a +2°C hygiene-critical environment.

Weekend-only installation phases allowed continuous meat production during the retrofit.

24,350 tote positions now supported by updated WMS, visualization, and hotline-service contract.

Market overview

SCR methodology note

Vendor landscape

Leaders

Implementation considerations

Important consideration