Case studies
MES

TYAZHMASH Increases Production 80% Using CATIA and ENOVIA SmarTeam

Case study showing how JSC Tyazhmash reduced design cycle time and increased output 80% by implementing CATIA and ENOVIA SmarTeam for large assembly management.

Published
June 4, 2026
Read time
3 min read
Source

JSC Tyazhmash, a Russian heavy machinery manufacturer, deployed Dassault Systemes CATIA and ENOVIA SmarTeam to shorten design and engineering cycles for complex industrial equipment. The PLM tools enabled automatic modeling of large installations, replaced manual drafting, and supported integration with 5-axis milling and inspection systems. Results included an 80% production increase and 50% reduction in rejects, plus improved contract win rates through better quality and faster delivery.

Key takeaways

CATIA and ENOVIA SmarTeam supported large assembly modeling and component interaction management

Phased rollout replaced drafting tables with digital design within two years

Integration with 5X milling and FARO inspection eliminated rework and improved first-pass quality

Production volumes rose 80% while product rejects fell 50%

PLM capability helped secure over 40% of contracts with advance booking