
Trafo Proiect: CATIA PLM Express for Power Transformer Design
Case study showing how Trafo Proiect uses CATIA PLM Express for 3D transformer design, interference checking, and change propagation to reduce errors and win new business.
Trafo Proiect, a Romanian design firm specializing in large power transformers up to 400 kV and 440 MVA, implemented CATIA PLM Express to manage complete design cycles from concept to production drawings. The solution enables automatic change propagation across assemblies and early interference detection in the virtual model, replacing manual 2D cross-checks. These capabilities improved design precision, shortened lead times, and increased customer confidence, directly supporting new business acquisition in a competitive market.
Automatic change propagation eliminates manual cross-checks across sub-assemblies
3D interference checking performed before release to manufacturing reduces rework
Manufacturing constraints incorporated during design phase improve producibility
CATIA adoption signals design reliability to transformer manufacturers and repair shops
Future integration with ENOVIA SmarTeam planned for validation workflows and field feedback