Case studies
MES

Pol-Eko-Aparatura Cuts Development Time 50% Using CATIA PLM Express

Case study shows how a Polish lab equipment maker switched to CATIA PLM Express for sheet metal design, cutting cycle time in half and eliminating redesign errors.

Published
June 4, 2026
Read time
3 min read
Source

Pol-Eko-Aparatura, a 90-employee manufacturer of laboratory cabinets, refrigerators, and ovens, replaced its prior CAD system with CATIA PLM Express in 2008. In-context assembly design, single-master-model control, and generative drawings allowed engineers to incorporate manufacturing constraints early and obtain customer feedback on virtual models. The result was a documented 50% reduction in project cycle time and fewer late-stage changes on NC-bent sheet metal parts.

Key takeaways

In-context design and single master model eliminated version conflicts and downstream errors

Generative drawings and sheet metal constraints reduced manual rework during bending operations

Virtual customer reviews cut late design changes and shortened approval cycles

One-week training enabled immediate productivity gains across 17-year product portfolio

Planned next step is ENOVIA SmarTeam for product data and collaboration management

Market overview

SCR methodology note

Vendor landscape

Leaders

Implementation considerations

Important consideration