Mohegan Sun Casino HVAC Monitoring and Control Case Study

Case study of ICONICS GENESIS32 deployment for HVAC monitoring at Mohegan Sun casino, covering 60 AHUs, 250 VAV boxes, and fire-smoke control sequences.

Published
June 4, 2026
Read time
3 min read
Source

Mohegan Sun implemented ICONICS GENESIS32 HMI/SCADA to monitor and control building systems across its 34-story hotel, 300,000 sq ft casino, arena, and support facilities. The system integrates GraphWorX32 graphics, AlarmWorX32 alarming, and TrendWorX32 trending for 60 air handling units, 250 VAV boxes, exhaust fans, and boiler/chiller plants. Arena AHUs switch to smoke evacuation mode during fire events, pulling 200,000 CFM outward instead of supplying conditioned air.

Key takeaways

GENESIS32 monitors 60 AHUs, 250 VAV boxes, 30 exhaust fans, and central plant equipment

Arena AHUs automatically switch to smoke evacuation mode during fire detection

GraphWorX32 provides custom graphical interfaces replacing text-only operator screens

Web-based navigation enables operators to quickly understand system status and respond

System supports both comfort conditioning and life-safety smoke control functions