
Marquis Crude Oil Logistics Optimization with Quintiq
Case study showing how Marquis scaled crude oil rail-barge logistics from 3 to 30 trains monthly using integrated planning software.
Marquis expanded from agricultural logistics into Bakken crude transport, facing rapid volume growth and terminal constraints at its Missouri facility. Existing spreadsheets could not handle increased scheduling complexity, asset cycling, or contract evaluation. Quintiq's SCP platform was implemented in under two weeks, providing real-time optimization across rail, barge, and storage operations while reducing demurrage and enabling what-if scenario planning.
Volume grew 1,000 percent in six months, overwhelming manual scheduling tools
Quintiq integrated rail and barge planning with limited terminal storage constraints
Implementation achieved operational use in less than two weeks
System reduced demurrage costs by improving vessel turn times and tank level management
What-if analysis supported contract bidding and strategic diversification decisions