LyondellBasell Wesseling PE Granule Logistics Control System
Case study of ProLeiT MES controlling 20,000 transport paths for polyethylene granules across 700 silos using dynamically distributed step sequencing.
LyondellBasell replaced manual pipe system configuration with a decentralized, object-oriented process control system at its Wesseling polyethylene plant. The solution uses ProLeiT TF-FL transport logistics functions and IDS configuration tools to parameterize bunkers, switches, and paths directly from Excel or the visualization server. Existing Siemens S7-400 hardware was retained while enabling topology changes without programming devices and supporting simulation-based commissioning.
20,000 parameterized transport paths managed across 700 silos without manual pipe reconfiguration
Dynamically distributed step sequence enables PC-based planning independent of control hardware mapping
Object-oriented architecture preserves existing Siemens S7-400 controllers while supporting topology changes
Decentralized operation allows plant staff to route granules to filling without central logistics intervention
Simulation of missing plant sections reduced commissioning downtime during rollout