
ENOVIA Implementation at Integral Coach Factory for Rail Coach Design
Case study showing how ICF used ENOVIA SmarTeam to manage multi-CAD data, reduce design time by 30%, and increase parts reuse by 20%.
Integral Coach Factory implemented ENOVIA SmarTeam to organize 400,000 legacy drawings and manage 15,000 parts across multi-CAD environments. The solution introduced structured workflows, centralized data storage, and RDSO-compliant documentation standards. Results included 30% faster design cycles, 20% higher part reuse, and increased annual production capacity to 1,350 coaches.
ENOVIA SmarTeam centralized legacy design data and enabled hierarchical retrieval
Multi-CAD integration supported SolidWorks and CATIA environments
Design development time reduced by 30% through workflow standardization
Parts reusability increased by 20%, lowering material and engineering costs
Phased rollout with training enabled adoption across multiple design locations