E.ON Trend s.r.o. Hydro Power Plant SCADA Implementation Case Study
Case study of ICONICS GENESIS32 deployment for centralized monitoring and control of six remote hydro plants totaling 30 MW.
E.ON Trend s.r.o. implemented GENESIS32 V9 with redundant servers and OPC connectivity to replace a legacy system across six Czech hydro plants. The solution aggregates over 5,000 I/O points from SAIA PLCs to a central command center 100 km away. Features include real-time alarming, secure set-point control, historical logging via TrendWorX32, and web-based access through WebHMI while meeting strict IT security policies.
Redundant GENESIS32 servers with DataWorX32 deliver high-availability SCADA for remote hydro assets
Over 5,000 analog and digital points monitored and logged from six dispersed plants
Centralized control reduces service trips and operating costs for 30 MW generation fleet
OPC-based architecture and SOAP/XML protocol satisfy corporate IT security requirements
Project completed in six months by system integrator Invelt - elektro s.r.o.