E.ON Trend s.r.o. Hydro Power Plant SCADA Implementation Case Study

Case study of ICONICS GENESIS32 deployment for centralized monitoring and control of six remote hydro plants totaling 30 MW.

Published
June 4, 2026
Read time
3 min read
Source

E.ON Trend s.r.o. implemented GENESIS32 V9 with redundant servers and OPC connectivity to replace a legacy system across six Czech hydro plants. The solution aggregates over 5,000 I/O points from SAIA PLCs to a central command center 100 km away. Features include real-time alarming, secure set-point control, historical logging via TrendWorX32, and web-based access through WebHMI while meeting strict IT security policies.

Key takeaways

Redundant GENESIS32 servers with DataWorX32 deliver high-availability SCADA for remote hydro assets

Over 5,000 analog and digital points monitored and logged from six dispersed plants

Centralized control reduces service trips and operating costs for 30 MW generation fleet

OPC-based architecture and SOAP/XML protocol satisfy corporate IT security requirements

Project completed in six months by system integrator Invelt - elektro s.r.o.

Market overview

SCR methodology note

Vendor landscape

Leaders

Implementation considerations

Important consideration