Dunapack Cuts Packaging Development Time 33% Using CATIA PLM Express
Case study shows how Dunapack replaced manual measurement and physical prototypes with CATIA 3D design to reduce packaging development time by one-third.
Dunapack, a Hungarian paper-based packaging manufacturer, implemented CATIA PLM Express to serve automotive customers already using CATIA. Designers now receive 3D models, perform precise virtual measurements, and create folding packaging directly in the same environment. This eliminated iterative physical prototyping, enabled parallel part and package production, and reduced development time and cost by 33%.
Replaced manual measurement and physical prototypes with direct 3D CATIA design
Achieved 33% reduction in packaging development time and cost
Enabled parallel production of automotive parts and custom packaging
Used surface and sheet metal modules to handle corrugated board folding
Designers reached proficiency after two weeks of training