Dunapack Cuts Packaging Development Time 33% Using CATIA PLM Express

Case study shows how Dunapack replaced manual measurement and physical prototypes with CATIA 3D design to reduce packaging development time by one-third.

Published
June 4, 2026
Read time
3 min read
Source

Dunapack, a Hungarian paper-based packaging manufacturer, implemented CATIA PLM Express to serve automotive customers already using CATIA. Designers now receive 3D models, perform precise virtual measurements, and create folding packaging directly in the same environment. This eliminated iterative physical prototyping, enabled parallel part and package production, and reduced development time and cost by 33%.

Key takeaways

Replaced manual measurement and physical prototypes with direct 3D CATIA design

Achieved 33% reduction in packaging development time and cost

Enabled parallel production of automotive parts and custom packaging

Used surface and sheet metal modules to handle corrugated board folding

Designers reached proficiency after two weeks of training