BSW Timber Case Study: Centralized TMS Route Planning
Case study showing how BSW Timber centralized route planning for 200+ third-party trucks across seven sawmills using Aptean Routing & Scheduling.
BSW Timber replaced decentralized manual routing with Aptean Routing & Scheduling Paragon Edition. The system enabled central planning in Carlisle with full visibility across all depots and third-party haulage contractors. Planners can now sequence loads for inbound and outbound movements on the same vehicle, reducing empty miles and administrative workload while supporting varied truck capacities required by different sawmill operations.
Centralized planning replaced site-level manual routing for seven sawmills
Route planning time reduced significantly with one team managing all loads
Third-party haulage scheduled with backhauls and successive loads
Visibility across all depots and loads from a single Carlisle location
Fewer planners required while maintaining or improving delivery performance