Beijing Traffic Control Center Rail Network Monitoring Case Study
Case study of ICONICS GENESIS32 HMI/SCADA deployment at Beijing Traffic Control Center for unified rail network monitoring across multiple operational control centers.
Documents the integration of SCADA, CCTV, passenger information, and incident evaluation systems at BTCC using GraphWorX32. The system connects 50 operator stations to real-time data from multiple rail lines, enabling shared access to rail data, video feeds, and automated incident response plans. Project delivered 30 percent engineering cost savings and met pre-Olympics deadlines.
Unified HMI/SCADA interface integrates SCADA, CCTV, passenger information, and decision support systems
50 networked operator stations provide centralized monitoring of multiple rail line operational control centers
OPC and XML connectivity enables integration with non-Microsoft platform systems
Automated and semi-automatic incident response plans triggered by linked Incident Evaluation System
30 percent reduction in engineering costs achieved through built-in templates, layers, and VBA controls